The Path to Solar

Going solar is easier than you think. We handle everything from design to permits, making the process seamless and stress-free.

Phase 1 (Day 1)

Free Consultation & Audit

We start by understanding your energy needs. Our experts will conduct a thorough site survey to design the most efficient system for you.

  • On-site roof assessment
  • Energy bill analysis
  • Custom 3D system design
  • Detailed savings projection
Phase 2 (Day 2-3)

Proposal & Agreement

We present a comprehensive proposal showing exactly how much you'll save and what the system will cost. No hidden fees, ever.

  • Transparent pricing quote
  • Flexible financing options
  • Simple contract signing
  • We begin the permit process
Phase 3 (Day 7-14)

Professional Installation

Once permits are approved, our certified crews arrive. Installation is typically completed in 1-3 days with minimal disruption to your home.

  • High-quality equipment delivery
  • Expert mounting and wiring
  • Strict quality inspection
  • Clean workspace guarantee
Phase 4 (Week 2-3)

Grid Connection & Net Metering

We handle all the bureaucracy with your local utility company to get your system officially connected to the grid.

  • Utility interconnection application
  • Final city/utility inspection
  • Bi-directional meter installation
  • Permission to Operate (PTO) granted
Phase 5 (Day 30+)

Start Saving Energy

Your system is officially live! You start generating clean power, offsetting your utility costs, and tracking your impact.

  • System goes live
  • Mobile app setup for monitoring
  • Watch your bill drop significantly
  • 25-year ongoing support

Ready to take the first step?

Get Your Free Proposal Today